New Technology Forum in Aberdeen; CodaOctopus Offers Complimentary Invitation
11/12/2008
CodaOctopus is to host a New Technology Forum in Aberdeen with a programme of topics relevant to hydrographic survey, underwater intervention, harbour construction and port and harbour security. The event takes place at the Aberdeen Exhibition and Conference Centre (AECC) on 10th December, 2008...
|
|
Sonsub Adopts SIMPL Approach
11/17/2008
Sonsub has developed a wide range of complementary next-generation 3D visualization and advanced dynamic analysis tools in order to form a streamlined approach to managing the lifecycle of subsea projects. Entitled Sonsub Integrated Management of Project Lifecycle (SIMPL), the recently implemented...
|
|
Kongsberg Support NATO Sub Rescue Trials
11/17/2008
Engineers from Kongsberg Maritime have been in the thick of the action in France and Norway during a combined trial and military exercise period involving the NATO Submarine Rescue System (NSRS). The NSRS is an extensive project by the French, Norwegian and UK Navies, to provide a fast response, highly...
|
|
LinkQuest: Solid Start for Discharge Measurement Profilers
11/17/2008
LinkQuest has sold its FlowQuest discharge measurement profilers to 10 countries since the product introduction less than a year ago. These systems have been used by various commercial companies, government organizations, research institutes and universities to measure discharge in rivers, estuaries,...
|
|
New Advanced Remote Manipulator
11/17/2008
CSIP launched its improved Hydraulic Advanced Remote Manipulator (ARM) 7. It joins a range of Underwater Manipulator Arms that work in conjunction with ROVs. The modular (ARM) 7 has been oxidized in red, and CSIP has also re-engineered the manipulator by adding more lift power and controllability...
|
|
MacArtney Buys Into A. Schmidt Marine
11/17/2008
MacArtney A/S bought into its long-term supplier, the engineering company A. Schmidt Marine A/S. The purchase of ASME A/S is designed to allow MacArtney to extend and improve its winch range and further develop into the marine electric power regulation within the offshore renewable energy sector...
|
|
Wesmar Debuts New Sonar
11/17/2008
Wesmar introduced the EV850 series, a new, all digital navigation and security sonar. This searchlight sonar features:
• Active electronic gyro controlled stabilization capable of correcting for 34 degrees of movement per second;
• 110 kHz frequency, proven effective in numerous tests for both navigation...
|
|
Cable Handling Made Easier
11/05/2008
Knowing how much and how fast cable is heaved in or paid out can be crucial for controlling underwater equipment, but standing next to the winch to view a display may not always be the optimal position for observing equipment entering and leaving the water...
|
|
Bourbon Reports Solid Growth, Prospects
11/05/2008
Driven by ‘exceptionally strong growth in Offshore Division’ of 43 percent, France’s Bourbon reported that 3Q revenues were up 19.5%
“The outstanding performance by the Offshore Division stemmed from the projected growth in the vessel fleet and improved rates following contract renewals whereas...
|
|
HYPACK 2009 Training Hydrographic conference
10/31/2008
HYPACK 2009
Hydrographic Training Conference
January 12-14, 2009
San Diego Marriott Hotel and Marina
San Diego, CA
You are invited to attend our 16th HYPACK® Hydrographic Training Conference. The HYPACK® 2009 Training Conference will be held January 12 - 14, 2009 at the San Diego Marriott...
|
|
SeaBat 7125 Improved
11/05/2008
RESON launched a new version of the SeaBat 7125 multibeam sonar systems designed especially for easy installation on small surface vessels and with the same exceptional performance.
The most notable change is a new transceiver that combines the function of sonar processor and interface unit thus...
|
|
Dubai Hydrographic Survey Progresses
11/05/2008
UTEC Survey is well into the first phase of its hydrographic survey of offshore Dubai. Work began at the beginning of October and the processing and hand-over of the acquisition data is now scheduled for completion by the end of November. This will place the survey team on-track in the preparation...
|
|